Link to Daily Telegraph (smoke rings on the North Circular?) |
"A new power plant planned for Copenhagen is designed to blow smoke rings and double as a ski slope. The facility has been announced as the winner of a competition to design a waste-to-energy plant for Copenhagen, with expected completion in 2016."
[We say: Replacement incinerators may be unavoidable, but increased capacity needs to be opposed.]
No comments:
Post a Comment